Wednesday, September 28, 2011

Trail Building Season


Come on out and help with some fun projects.
October 8th:
  • Octoberfest clean-up with some sweet new switchbacks
  • Re-route trail T connector from U with some cool rollers
  • Berm up trail U in the clear cut
Drive to Underdown Lake in the morning: From 17 take Heineman Road west to Horn Lake Road (not marked unfortunately) and then the Underdown Lake access road. We'll be there early and all morning. Bring rakes and your favorite McLeod\mattock type tool.

October 9th:
  • Extend trail J past the Homestead with about 10 more turns & berms.
Take the east end of Loop Road from Copper Lake Road. Bring rakes and your favorite McLeod\Mattock type tool.

October 29th 5PM:
  • Ghost Ride
  • Rhinelander vs. Wausau Capture the Flag or something like that
  • Night Polo
  • Spooks

Saturday, September 17, 2011

Work Together

The Underdown Horse Club recently opened a difficult trail for themselves near White Lightning (Trail I) and a trail they call the Moonshine Trail near the homestead (Trail J). With my cooperation they pulled up signs and moved the Moonshine Trail to a new route off of the bike trail. I actually helped build horse trail today, but it is a lot easier that re-building bike trail and I felt that both groups should have a chance to pass the historic Underdown homestead.

99% of horse riders respect the bike trails and are embarrassed when a horse does damage to a bike trail. I am equally embarrassed when bikers don't use their heads. Because both user groups have separate trail systems so it is rare that you will see a horse out in the woods, but make sure that you slow way down and greet them when you see a horse on a road. I don't want to hear any more about bikers blowing by little girls on ponies in the parking lot.

On October 8th we'll still be cleaning and berming on Oktoberfest starting at Underdown Lake in the morning whenever you can get there, but on October 9th there will be work to do by the homestead. On that morning you will have the opportunity to extend the Homestead Trail another hundred yards or so to a safer exit, plus we'll be doing erosion prevention between White Lightning and the Homestead.

Sunday, September 11, 2011

High and Dry

New bridge on trail C.